I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3 in total) :  1  [ 2 ]  3  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild01-Mar-11 09:42
Views : 949
The cockpit components required only a little adjustment to fit properly.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild01-Mar-11 09:40
Views : 728
The outrigger floats are Guillows and size wise the look good.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild01-Mar-11 09:38
Views : 594
The nose of the float and rear are Guillows plastic with just a little balsa shim in place to compensate for size.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroParked01-Mar-11 09:35
Views : 643
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild01-Mar-11 09:35
Views : 630
The components masked (Drafting Tape) together to see what it looks like -- an A6M2-N Rufe.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:37
Views : 617
The tail feathers are papered.
Hangar Aircraft Category Date Preview
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:35
Views : 604
The Guillows vacu outboard floats are large ennough to use on a1/24th conversion.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:33
Views : 620
The main float with the support fitted.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:31
Views : 579
The three sections of the wing are ready for papering
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:29
Views : 581
The main float.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:28
Views : 782
The fusselage is nearing completion.
jerry campbellDave Diels Engineering, Inc Kit # 18, A6M2 ZeroBuild25-Feb-11 12:26
Views : 776
The cockpit sidewalls, instrument panel, MG cocking levers, and the gunsight are all ready to install.
Page (3 in total) :  1  [ 2 ]  3  [ < Prev ] [ Next > ]