I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   3   4   5   6   7  [ 8 ]  9   10   11   12   13   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild21-Mar-15 15:41
Views : 572
The lengthy task of rigging installation has begun. The effort today focused on the dorsal surface of the upper plane.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild21-Mar-15 15:41
Views : 540
First he heavy bracing wires that extend from the wing pylons.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild21-Mar-15 15:40
Views : 496
I have a copy of the RAF wiring diagram including wire location and gauge.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild21-Mar-15 15:39
Views : 552
This shall be the first time that we will attempt to wire with three diameters. Placing different diameters in locations as listed on the wiring diagram.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 12:00
Views : 555
We had intended to start the install of the flight wires and bracing rigging this day. However this was not the case. The design committee decided that it would be prudent to address the lift mechanism issue for the Lewis guns. The install of the mechanism would be hindered by the rigging wiring. As stated in the Windsock data booklet, “the lever used to actuate the lift mechanism could be found in a railroad track switch!” Here is what Gumby and I fabricated this day. We were able to utilize one of the pulleys that were made for this build. Lewis guns in the firing position.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:59
Views : 578
Lewis guns lowered.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:58
Views : 568
Machine gun lift mechanism completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:57
Views : 527
Machine gun lift mechanism finished.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:58
Views : 632
A big day in little Ogre’s life that being permanent wings.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:54
Views : 621
The epoxy molecules have once again worked their magic.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:53
Views : 670
Ogre’s 106.68 cm. upper wing span defines the limit to the shop work table.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:52
Views : 587
Now onward to the flight and bracing wires!
Page (32 in total) :  <<   3   4   5   6   7  [ 8 ]  9   10   11   12   13   >>  [ < Prev ] [ Next > ]