Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (10032 in total) :  <<   2578   2579   2580   2581   2582  [ 2583 ]  2584   2585   2586   2587   2588   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
Don CDave Diels Engineering, Inc Plan #59, Curtiss C-46 CommandoBuild20-Mar-15 17:07
Views : 985
It works.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 12:00
Views : 1050
We had intended to start the install of the flight wires and bracing rigging this day. However this was not the case. The design committee decided that it would be prudent to address the lift mechanism issue for the Lewis guns. The install of the mechanism would be hindered by the rigging wiring. As stated in the Windsock data booklet, “the lever used to actuate the lift mechanism could be found in a railroad track switch!” Here is what Gumby and I fabricated this day. We were able to utilize one of the pulleys that were made for this build. Lewis guns in the firing position.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:59
Views : 1059
Lewis guns lowered.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:58
Views : 1061
Machine gun lift mechanism completed.
Page (10032 in total) :  <<   2578   2579   2580   2581   2582  [ 2583 ]  2584   2585   2586   2587   2588   >>  [ < Prev ] [ Next > ]