Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (56 in total) :  <<   4   5   6   7   8   9   10   11   12   13   14   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
Skyediamonds1985Guillows Series 200 - SE5aBuild18-Oct-16 21:26
Views : 885
Just prior to cockpit coaming.
Skyediamonds1985Guillows Series 200 - SE5aBuild18-Oct-16 21:25
Views : 830
Used the same ol' hand bag from the PT-17's cockpits on this.,
Skyediamonds1985Guillows Series 200 - SE5aBuild18-Oct-16 21:24
Views : 753
Sorry for the "slight" delay. Mandatory attendance to Disneyland for 4 grueling days with grandson and other "fun" things
Skyediamonds1985Guillows Series 200 - SE5aParked05-Oct-16 00:32
Views : 861
Tail surfaces finished with control horns, cables and rigging. Onward to the ailerons, starting with the bottom wing.
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:30
Views : 824
Top side. Notice the double rigging for the rudder. This explains the three cables to each side of the rudder bar. To the more astute observers, I added brass tubing to the underside of the fin to give it some space between the bottom of the vertical fin and the top of the fuselage as on the real aircraft.
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:27
Views : 864
End result with tail skid and rigging installed. The tail skid had its own control cables. This is part of the reason why I added thee control cables to each side of the rudder bar
Hangar Aircraft Category Date Preview
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:25
Views : 884
Starting on the double-looping to the forward portion of the control horn.
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:24
Views : 833
Added a small patch of Solartex covering and then made a small hole and super-glued the end.
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:19
Views : 802
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:18
Views : 860
Thread is double looped back into the bead. That's challenging for the eyes and hands.
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:17
Views : 775
Added wiring for the rigging yet to come. Threading the control horn. Notice the small bead on the thread.
Skyediamonds1985Guillows Series 200 - SE5aBuild05-Oct-16 00:08
Views : 835
Control horns and base prior to threading the control "cables" and adding rigging
Page (56 in total) :  <<   4   5   6   7   8   9   10   11   12   13   14   >>  [ < Prev ] [ Next > ]