Hangar |
Aircraft |
Category |
Date |
Preview |
rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 17:12 | |
Views : 589 |
About a week later: The fuse has been removed rom the jig, which was modified to be a building cradle. The vertical fin has been sealed with Cabots "Quick-Dry" lacquer basec spray sanding sealer. In our new Eco-Friendly world, these high VOC items are getting really hard to find. The fin has been primed with a high-fill automotive rattle can lacquer. |
rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:57 | |
Views : 532 |
This is the third attempt at constructing the vertical fin. It's been a long time since I built a balsa model (about 50 years), so I expect to have bad days. The ribs are 1/8" and the sheathing is hard 1/16" stuff. |
rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:53 | |
Views : 559 |
Starting the process of planking. I had several bottles of CA glue from our local Hobby Lobby which I used to glue up the formers and longerons. When I took the clamps loose, everything fell apart! A two hour drive to Sioux Falls to the LHS to get some fresh CA solved the problem. I'm using 3/32" X 1/4" strips for planking. I plan on planking the entire upper half of the fuselage before removing teh assembly from the jig. |
rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:45 | |
Views : 519 |
Another view of the jig and clamps. My "other hobby" is woodworking and one of the truisms from that avocation is that you can never have enough clamps. |
rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:43 | |
Views : 531 |
Longerons and formers mounted on the alignment jig. Got Clamps? |
rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:41 | |
Views : 507 |
THis is the jig that I made to insure the alignment of the longerons. The longerons actually change elevation from the main spar back to the final former by about 7/16", thsu the jig. |