Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (10032 in total) :  <<   2696   2697   2698   2699   2700  [ 2701 ]  2702   2703   2704   2705   2706   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Jan-15 14:34
Views : 816
The completion of the framing and covering of the fuse should keep the Gumster occupied for a couple of work periods. Enough construction today, time for playoff football!
BriandKilbyGuillows Series 500 - SpitfireBuild18-Jan-15 14:17
Views : 871
i decided to build the comet spitfire that i graciously got from poppy before i build my f-4.
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild18-Jan-15 10:18
Views : 1128
The great speckled bird! Two things happened: (1) My planking powress is lacking: many voids between the planks to fill. (2) I suffered some sort of incomparability issue between the intial finish and the high-fill primer, resulting in may "Crazed" areas. This is going to take a while as the primer surface has to nearly perfect if I am to lay on a aluminum finish coat. Catchya later!
raylScratch Built Consolidated XF-92ABuild18-Jan-15 10:12
Views : 1003
Finished all of the fuse planking. Installed 1/64" ply main L/G well inserts. I did this to simulate the thin edges of the wheel wells. I have three layers of sandinig sealer on the fuse now so the next step will be to lay on some automotive type high-fill primer.
Page (10032 in total) :  <<   2696   2697   2698   2699   2700  [ 2701 ]  2702   2703   2704   2705   2706   >>  [ < Prev ] [ Next > ]