Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (10032 in total) :  <<   2697   2698   2699   2700   2701  [ 2702 ]  2703   2704   2705   2706   2707   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild18-Jan-15 10:04
Views : 1040
The main L/G firmly mounted into it's plywood bulkheads. I used a "Wixey" digital angle gauge to make sure the fuse was level (laterally) then set a bar across the L/G strutts to insure that they were level before supergluing them into place. I then drilled 3/32" cross pin holes through the main member and inserted music wire into those holes. The L/G shouldn't move at all.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Jan-15 11:16
Views : 805
Gumby had to figure how to apply force from the control stick so it torqued the elevator bell cranks in the proper direction. Though not pretty the linkage works! Hats off to those of you who build models with servos and linkages. This area of aeroplane construction requires mastering a whole new and complex skill set incorporating areas of expertise that neither Gumby or me wish to venture into!
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild17-Jan-15 09:49
Views : 1016
Bottom sheeting instaled on the wings and the elevons attached. Now I'm ready to finsih the fuse planking and move on to the sealer/primer stage.
raylScratch Built Consolidated XF-92ABuild17-Jan-15 09:44
Views : 1054
Main gear wells done. Ready to sheet the bottom of the wings.
Page (10032 in total) :  <<   2697   2698   2699   2700   2701  [ 2702 ]  2703   2704   2705   2706   2707   >>  [ < Prev ] [ Next > ]