Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (425 in total) :  <<   90   91   92   93   94  [ 95 ]  96   97   98   99   100   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
David DuckettDumas Kit #233. MiG 17Build05-Jan-15 20:55
Views : 876
David DuckettDumas Kit #233. MiG 17Build05-Jan-15 20:54
Views : 839
I traced the wing ribs for the Cutlass and am using the bottom portion to make the flat bottomed wing into a more realistic airfoil.
David DuckettDumas Kit #233. MiG 17Build03-Jan-15 19:58
Views : 733
If it ever warms up again.....
David DuckettDumas Kit #233. MiG 17Build03-Jan-15 19:57
Views : 629
David DuckettDumas Kit #233. MiG 17Build03-Jan-15 19:56
Views : 689
The wings will be totally infilled and the ribs modified for a bottom airfoil so some extra wood has been added to the left wing before further construction proceeds.
David DuckettDumas Kit #233. MiG 17Build03-Jan-15 19:54
Views : 653
THe tab on the fuselage and the first two ribs set a dihedral of 1" as this is designed as a flying model. The real plane has anhedral to the wings and these cups will be just right in setting it when gluing on the wings.
Hangar Aircraft Category Date Preview
David DuckettDumas Kit #233. MiG 17Build03-Jan-15 19:51
Views : 677
The wings per plan. The red pieces will be removed.
David DuckettDumas Kit #233. MiG 17Build02-Jan-15 18:40
Views : 625
David DuckettDumas Kit #233. MiG 17Build02-Jan-15 18:40
Views : 620
Ready for filler
David DuckettDumas Kit #233. MiG 17Build01-Jan-15 07:21
Views : 667
The Mig 15/17 has always been a favorite so I was quite pleased to see Brian's build and , of course, had to have one. The construction is fairly simple and the laser cut pieces fit perfectly.
David DuckettDumas Kit #233. MiG 17Build01-Jan-15 07:19
Views : 706
It's still too cold to do the outside doping for the typhoon and while I have a good supply of paint and canvases but the urge is to build something. Patches is on duty to supervise.
David DuckettDave Diels Engineering, Inc Kit #29 Hawker Typhoon Mk 1BBuild02-Dec-14 18:32
Views : 745
The fin/rudder needs an application of filler before being glued in place.
Page (425 in total) :  <<   90   91   92   93   94  [ 95 ]  96   97   98   99   100   >>  [ < Prev ] [ Next > ]