I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (365 in total) :  <<   7   8   9   10   11  [ 12 ]  13   14   15   16   17   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser BAT FK-24 BaboonParked22-Jan-17 14:36
Views : 413
John M OshustManzanoLaser BAT FK-24 BaboonBuild22-Jan-17 14:36
Views : 382
Crank case must be sanded to shape.
John M OshustManzanoLaser BAT FK-24 BaboonParked21-Jan-17 14:09
Views : 381
And now there are seven pseudo cylinders.
John M OshustManzanoLaser BAT FK-24 BaboonBuild21-Jan-17 14:06
Views : 354
Aligned on a small dowel, the cylinder sandwiches are wood glued together.
John M OshustManzanoLaser BAT FK-24 BaboonBuild19-Jan-17 11:48
Views : 379
The construction of the Baboon was initiated this day. We wish to take advantage of the multitude of laser cut balsa and plywood disks that are supplied in this short kit. This is a bare bones kit without instructions. Baboon fabrication should reawaken that part of my noodle programmed for problem solving, specifically the area dedicated to model fabrication. I was drawn to this particular kit because of the seven cylinder radial engine. The kit engine does not mimic the real Baboon power plant. I find the design of the kit engine aesthetically pleasing and as such, we will not construct an engine that attempts to duplicate the "real thing!" After finally understanding the order of disk stacking, Gumby and I dry assembled two cylinders this day. Two down, five more to go!
John M OshustManzanoLaser BAT FK-24 BaboonBuild13-Jan-17 15:59
Views : 413
Just about completed. Added an automatic boiler feed valve today. My Princess wanted it as she was afraid of filling the boiler when I am in the hills
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser BAT FK-24 BaboonBuild07-Jan-17 19:28
Views : 371
The grandson had his telescope out again. A photo of the m45 the Pleiades
John M OshustManzanoLaser BAT FK-24 BaboonBuild31-Dec-16 13:56
Views : 378
Though Gumby and Pokey were reunited, production on the Baboon is on hold. The 42 year old Peerless boiler in the house furnace is cracked. The furnace and burner will be replaced one day this week. OUCH!!
John M OshustManzanoLaser BAT FK-24 BaboonBuild27-Dec-16 10:48
Views : 436
John M OshustManzanoLaser BAT FK-24 BaboonBuild27-Dec-16 10:48
Views : 372
John M OshustManzanoLaser BAT FK-24 BaboonBuild24-Dec-16 21:12
Views : 417
To all carbon units that frequent Virtual Aerodrome... Merry Christmas! Santa brought Pokey to help with the heavy lifting as we construct the Baboon.
John M OshustManzanoLaser BAT FK-24 BaboonParked20-Dec-16 16:31
Views : 409
The Gumster prepares to open the cargo container, revealing the primate components stored within.
Page (365 in total) :  <<   7   8   9   10   11  [ 12 ]  13   14   15   16   17   >>  [ < Prev ] [ Next > ]