I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (45 in total) :  <<   7   8   9   10   11  [ 12 ]  13   14   15   16   17   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
pfinnJetco Dayton-Wright RB-1Build13-Feb-11 23:24
Views : 1225
After some serious deliberation, I decided to bite the bullet and install scale action retracts. The gaping holes lead to some creative reinforcement while leaving room for the "Monkey Motion". For time time being , I'm leaning towards pneumatics. We'll see.
pfinnScratch Built IL-2 SturmovicReference06-Feb-11 16:00
Views : 1339
Well, for what it's worth. ARF micro "Mossy". Finally some three blade regular and matching contra-rotating props for my stuff! Here's a link with video. http://www.horizonhobby.com/Products/Default.aspx?ProdID=PKZU1380
pfinnJetco Dayton-Wright RB-1Build29-Jan-11 09:52
Views : 1165
Bevel the edges to match longeron angles. I used good 'ol Elmers to bond. A little CA at the rear pointy side.
pfinnJetco Dayton-Wright RB-1Build29-Jan-11 09:49
Views : 1062
Here is the pattern on the Balsa. Use a marker (before you stick it down!) to make it more visible. When cutting long smooth curves like this I find that during the cut, looking ahead about 3/8" to 1/2" results in a smoother cut that follows the line much more closely. "Leading the cut".
pfinnJetco Dayton-Wright RB-1Build29-Jan-11 09:43
Views : 1121
Carefully cut along the edges.
pfinnJetco Dayton-Wright RB-1Build29-Jan-11 09:40
Views : 1179
Infilling selected areas between stringers. To make a pattern, I used non-flexible tape (Magic/removable) stuck down only to the two longerons to be filled between. Don't stretch tight. I used a small staightedge and adhered the tape to the edges center out to allow the tape to "Skew" (?) as the plane twisted.
Hangar Aircraft Category Date Preview
pfinnJetco Dayton-Wright RB-1Build28-Jan-11 14:02
Views : 1245
I do like using the Jig.
pfinnJetco Dayton-Wright RB-1Build28-Jan-11 14:01
Views : 1158
This type af layout is a bit challenging in some respects.
pfinnJetco Dayton-Wright RB-1Build28-Jan-11 13:59
Views : 1089
As per plan, the stingers are arranged ala "Waterline". Meaning they are parralel to the axis of the fuselage.
pfinnJetco Dayton-Wright RB-1Build27-Jan-11 11:48
Views : 1088
Time for stringers and in-fll where needed. After a couple times, this method could be darn quick. Very straight.
pfinnJetco Dayton-Wright RB-1Build27-Jan-11 11:43
Views : 1114
In hindsight, I should have just waited to notch the formers until this point. Not that they were off (well, not too much! ;o) ).
pfinnJetco Dayton-Wright RB-1Build27-Jan-11 11:39
Views : 1075
The jig has bulkhead positions marked on the side walls. I used pins to help easily locate tthe bulkheads. Again, double stick tape is used to secure the cross members to the fixture. Other builders use rubber bands to do this using a row of small brads near the base in which to hook the bands to.The 2" offset marks line up with the edge of the fixture so all of the formers line up correctly.
Page (45 in total) :  <<   7   8   9   10   11  [ 12 ]  13   14   15   16   17   >>  [ < Prev ] [ Next > ]