I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (14 in total) :  <<   7   8   9   10   11   12   13   14  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustAerodromeRC Halberstadt DIIIBuild31-Dec-11 19:57
Views : 527
Cannot think of a better way to ring in the new year.....a glass of wine and Katrina!! Hubba, hubba!
John M OshustAerodromeRC Halberstadt DIIIBuild31-Dec-11 15:14
Views : 492
Engine is permanently installed.
John M OshustAerodromeRC Halberstadt DIIIBuild31-Dec-11 15:14
Views : 504
John M OshustAerodromeRC Halberstadt DIIIBuild31-Dec-11 15:13
Views : 536
A work in progress but progress today none the less! HAPPY NEW YEAR!!!
John M OshustAerodromeRC Halberstadt DIIIBuild30-Dec-11 16:53
Views : 542
Right side completed. Spark plugs and wires. "Aufpuffs" exhaust ports. Almost built an engine that would not fit!!!! The exhaust piping will be a real treat. I may have to go with plan "B"!
John M OshustAerodromeRC Halberstadt DIIIBuild29-Dec-11 17:42
Views : 563
Left side of the Argus completed. Note: Crankcase, fuel pump, and water pump omitted as they will not be visible when engine is installed.
Hangar Aircraft Category Date Preview
John M OshustAerodromeRC Halberstadt DIIIBuild29-Dec-11 17:39
Views : 491
Rough fit not too bad.
John M OshustAerodromeRC Halberstadt DIIIBuild29-Dec-11 13:03
Views : 512
The first step, in my attempt, at Argus engine fabrication.
John M OshustAerodromeRC Halberstadt DIIIBuild29-Dec-11 13:01
Views : 511
The beginning of an Argus AS III aero-plane engine.
John M OshustAerodromeRC Halberstadt DIIIBuild29-Dec-11 13:00
Views : 521
This will eventually work OK.....however full completion is away down the road.
John M OshustAerodromeRC Halberstadt DIIIBuild28-Dec-11 19:18
Views : 492
I covered the wood with poly-span and applied sealer. Cut open the pit and fitted combing. Ordered the drapes and flooring.
John M OshustAerodromeRC Halberstadt DIIIBuild27-Dec-11 16:31
Views : 564
Fuse progress right.
Page (14 in total) :  <<   7   8   9   10   11   12   13   14  [ < Prev ] [ Next > ]