I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (26 in total) :  <<   17   18   19   20   21   22   23   24   25   26  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild22-Jun-07 17:44
Views : 1625
Cut tissue one stringer too far. Guess I have to patch with additional silkspan. Next time I'll test fit the plastic prior to building nacelles. Thought thats what the picture showed. Oops!!
moostang51Guillows Series 2000 - B-24 LiberatorBuild22-Jun-07 17:40
Views : 1998
Nacelles framed and filled, not yet sanded. Notice how cutout is different on tissue between left and right wing.
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Jun-07 18:42
Views : 1392
Lots of trial fitting onto stabilizer before shaping but fit is perfect. Going to use the pre-built moveable rear rudder assemly and the cardboard overlays so panel lines can be used as per plan. Only thing, should have doped the stabilizer prior to multi
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Jun-07 18:35
Views : 1395
New carved rudder. Starts as a 1/2 stock. First cut through notch for stabilizer then lots of shaping and sanding. Used the Guillows plan for final profile.
moostang51Guillows Series 2000 - B-24 LiberatorBuild10-Jun-07 18:10
Views : 1511
Whatever is on the plane has been prepped for covering. Had a little issue with the shaping of the right rudder. The rudder construction on this plane proved to be quite a challenge since it will be moveable. Cosidered carving it out of 3/8 solid stock bu
moostang51Guillows Series 2000 - B-24 LiberatorBuild10-Jun-07 18:01
Views : 1458
Wings completed. Extra stringers and the use of heavy grade silkspan makes for a much better finished product.
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild10-Jun-07 17:58
Views : 1545
One piece wet SGM tissue applied. Used dope to seal balsa, white glue to attach silkspan and dope for sealing tissue.
moostang51Guillows Series 2000 - B-24 LiberatorBuild28-May-07 17:49
Views : 1399
This part is ready for shaping and trial fitting of plastic. Haven't touched the monster in about a month, but I still find time to check out the website daily and occasinally comment. Keep up the good work.
moostang51Guillows Series 2000 - B-24 LiberatorBuild28-May-07 17:45
Views : 1412
Most tedious part of the project so far. Still a little more wood to go but had to stop.... all strung out.
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Apr-07 18:40
Views : 1868
Lots of extra mood means lots of extra sanding. Can't believe how strong this is now. I'll need it with all the handling and fitting of plastic later on.
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Apr-07 13:12
Views : 1530
Bottom view of wing. Extra 3/32" wing root former provides additional surface for silkspan covering. Thanks for the idea David.
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Apr-07 13:08
Views : 1601
Top of wing with extra stringers and as per plan.
Page (26 in total) :  <<   17   18   19   20   21   22   23   24   25   26  [ < Prev ] [ Next > ]