| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 30-May-09 08:02 |  | | Views : 1130 | | The extra former in the rear is strengthner when joining front and rear halves. |
| poppy | Eureka Boeing B-29 | Build | 30-May-09 08:00 |  | | Views : 1007 | | I couldn't sleep last night so I decided to smell some glue. Front fuselage started. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| John M Oshust | AerodromeRC PT Crop Duster | Parked | 29-May-09 18:49 |  | | Views : 1088 | | Just another view. |
| John M Oshust | AerodromeRC PT Crop Duster | Build | 29-May-09 18:48 |  | | Views : 1071 | | Back in production. The L wing now fits the fuse and is secured with dowels and nuts and bolts. The wings shall be removable for ease of transport. The lower wing surface is sheeted....the upper will be covered with poly span. The wings now need to be shaped and sanded. |
|