I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (365 in total) :  <<   27   28   29   30   31  [ 32 ]  33   34   35   36   37   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:08
Views : 353
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:07
Views : 365
Last on the day’s agenda, the feathers. I had hoped to have the frames covered with poly span this day, but time for cocktails arrived postponing covering until the morrow. The frames were sealed and are ready first thing tomorrow morn.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:53
Views : 391
A lot of bits and pieces are falling together to complete the fuselage fabricating.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:51
Views : 391
Access ports from the cockpit to the MG were cut and the Vickers has been positioned with the wire mounting rods.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:50
Views : 356
A complete install of the Vickers is in queue.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:48
Views : 363
The feathers should be covered tomorrow.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked03-Feb-15 17:47
Views : 349
The stabilizer awaits shaping and sealing.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:46
Views : 315
The feathers should be covered tomorrow.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:44
Views : 317
The “window” in the pit wall does light the pit interior.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild02-Feb-15 14:10
Views : 388
Well the Gumster is glad that this task is completed. The rudder is in the rough but the fin has been sanded and shaped. Gumby said that he should have both covered by the end of his work day tomorrow!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild01-Feb-15 12:40
Views : 378
My reference books have had photos of this tyre company’s name on a few British aeroplanes. Gumby decided to use there tyres on Ogre therefore the Palmer Cord Aero Tyre trademark was imprinted.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild01-Feb-15 12:40
Views : 380
Laminating balsa for the fin, the rudder lumber is still soaking.
Page (365 in total) :  <<   27   28   29   30   31  [ 32 ]  33   34   35   36   37   >>  [ < Prev ] [ Next > ]