Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (10031 in total) :  <<   9416   9417   9418   9419   9420  [ 9421 ]  9422   9423   9424   9425   9426   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild26-Mar-07 17:56
Views : 2223
Left side stringers doubled. Rubber band at the nose assists in holding curve. Am using a new CA glue (Build It from Tower Hobbies) Using the thin and medium but the thin is like water. Tough to control amount of flow so I hope I don't experience problems
moostang51Guillows Series 2000 - B-24 LiberatorBuild26-Mar-07 12:26
Views : 2203
Half an hour later, notches on the left side are completed. The 1/16" sheet gives a perfect slot for the 3/32" stringers. Now for the right side.
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild26-Mar-07 12:22
Views : 2072
A dremel with carbide cutter and 1/16" thick sheet with 220 sandpaper glued on does the trick for notching extra stringers. The dremel was set at slowest speed for maximum control.
John M OshustGuillows Series 800 - Sopwith CamelBuild25-Mar-07 23:42
Views : 2579
Sorry all of my Camel images should be labeled "BUILD" I have 90 hrs in so far and just started the upper wing
Page (10031 in total) :  <<   9416   9417   9418   9419   9420  [ 9421 ]  9422   9423   9424   9425   9426   >>  [ < Prev ] [ Next > ]