Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (365 in total) :  <<   34   35   36   37   38   39   40   41   42   43   44   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Mar-14 13:27
Views : 819
Everything seems to fit.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Mar-14 13:27
Views : 813
One more day and the cylinders should be completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Mar-14 13:26
Views : 832
Gumby has already started the intake manifold.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked25-Mar-14 12:57
Views : 762
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked25-Mar-14 12:55
Views : 758
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Mar-14 12:54
Views : 808
Gumby did some calculations. When both banks of cylinders are finished, the cylinders alone will contain 504 components.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Mar-14 12:52
Views : 875
This bank of cylinders is completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Mar-14 12:41
Views : 840
The shaping of the cylinders is complete.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Mar-14 12:40
Views : 781
Now the valve train detailing begins.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Mar-14 12:39
Views : 846
This stage complete, on to the other cylinder bank.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Mar-14 17:26
Views : 883
The Gumster torques a bolt for a cylinder test fit. He fabricated a new crankcase today and the redesign worked better than expected.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Mar-14 17:25
Views : 814
The basic shaping of the cylinder set is not yet completed but Gumby put a quick coat of paint on them and hastily installed them into the crankcase for a “look see”. He has been at engine construction for over a week and there is quite a bit of work remaining. That’s why I pay him well over minimum wage. Model fabrication pays better than making burgers at Burger King!
Page (365 in total) :  <<   34   35   36   37   38   39   40   41   42   43   44   >>  [ < Prev ] [ Next > ]