I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (365 in total) :  <<   45   46   47   48   49  [ 50 ]  51   52   53   54   55   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild22-Feb-14 10:48
Views : 319
Aileron crank covers
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild22-Feb-14 10:46
Views : 363
Commencing shaping of an airscrew this afternoon.
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild21-Feb-14 15:17
Views : 365
Time today well spent on completing the rigging.
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild21-Feb-14 15:16
Views : 394
I reengineered the aileron linkage, Made some modifications to the fuselage and reinstalled. The linkage works similar to the original. The control rods attach the ailerons to a toggle crank below the floor in the cockpit. Now if I lift one aileron the opposite side goes down. For those of you accustomed to the install of control surface mechanics this may seem trivial but for me this is a major accomplishment. Who knows maybe someday I will build a plane to fly and crash!
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild21-Feb-14 15:15
Views : 325
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild21-Feb-14 15:15
Views : 349
Tomorrow prop day.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild20-Feb-14 16:00
Views : 414
I have used enough expletives for one day. The port side is rigged and the port aileron control rods are connected. “Stretch Magic” black necklace chord works marvelously.
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild19-Feb-14 18:48
Views : 428
With the pungent aroma of cross linking epoxy molecules wafting thru the workshop atmosphere, Nunzio acquires his permanent air foils.
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild19-Feb-14 18:47
Views : 366
Prior to the permanent air foil assembly, 44 anchor eyes were attached to the wings and struts in preparation for tomorrow's rigging adventure.
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild19-Feb-14 10:53
Views : 384
Nunzio is saved from a fiery demise. Now I must add anchor points for rigging before the wings are made permanent. This enables the rigging to be installed using fewer expletives!
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild19-Feb-14 10:52
Views : 368
I was viewing the wings with the tail skid on the earth.
John M OshustManzanoLaser Ansaldo A.1 BalillaBuild19-Feb-14 10:51
Views : 423
I found two construction errors on my part. 1. I had sheeted the upper air foil center section making it thicker. 2. The pictures in the reference book have the tail elevated as in flight. This changes the angle of attack of the wings. and their apparent alignment to each other.
Page (365 in total) :  <<   45   46   47   48   49  [ 50 ]  51   52   53   54   55   >>  [ < Prev ] [ Next > ]