| Hangar |
Aircraft |
Category |
Date |
Preview |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:41 |  | | Views : 1284 | | Top strobe light in place. There is one on the bottom of the fuselage too. |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:40 |  | | Views : 1294 | | Lighting wires being added. It's going to get crowded in there with 8 LEDs wiring. |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:39 |  | | Views : 1267 | | Showing the finished fin modifications. |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:39 |  | | Views : 1258 | | Radar Enclosure added to provide width for the light! |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:38 |  | | Views : 1340 | | Cutouts made for the LED, and channels added for the wires. |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:37 |  | | Views : 1275 | | The unaltered fin, awaiting modifcations to accept the tail strobe light. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:37 |  | | Views : 1405 | | Bascially framed up in one day, testing out the lights. |
| jgood | Molt Models Tyro | Build | 18-Jan-06 07:34 |  | | Views : 1358 | | Making a start on my third Tyro build. |
| jgood | Molt Models Tyro | Aerial | 30-Nov-05 09:13 |  | | Views : 1434 | | Downtown Miami from a height of about 400 feet. |
| jgood | Molt Models Tyro | Aerial | 30-Nov-05 09:01 |  | | Views : 1436 | | The 10 Museum Park and Marina Blue condos are really going up fast. Check back with the photos from August to see the difference. |
| jgood | Molt Models Tyro | Aerial | 25-Nov-05 09:06 |  | | Views : 1511 | | Majesty of the Seas, in the Port of Miami. |
| jgood | Molt Models Tyro | Aerial | 25-Nov-05 09:04 |  | | Views : 1758 | | Down town Miami from Watson Island. |
|