Hangar |
Aircraft |
Category |
Date |
Preview |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 08-Nov-21 14:46 | | Views : 467 | |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 08-Nov-21 14:45 | | Views : 531 | Finished |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:38 | | Views : 563 | One more light application of spackling will be added and then sanded smooth which will make it all ready to dope. |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:35 | | Views : 485 | adfter drying overnight, sand with 220 wet/dry sandpaper. Two applications are needed for such shapes. |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:33 | | Views : 423 | The space between the fuselage and wing were filled with scraps and the pattern taped. |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:32 | | Views : 418 | Wing infill is 1/16' stock bottom, 3/32" top |
|
|