I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (2 in total) :  <<  [ < Prev ]
Hangar Aircraft Category Date Preview
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreFlying04-Feb-11 21:53
Views : 1203
The F-100 is part of the outdoor display associated with the Louisiana Maneuvers Museum located at Camp Beauregard in Pineville, Louisiana. The profile F-100 is just beneath the canopy of the real one.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreFlying04-Feb-11 21:49
Views : 1277
Mid December found us visiting family in Louisiana. While there we took the opportunity to visit a F-100 on display and fly the profile F-100 at the site.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreFlying04-Feb-11 03:52
Views : 1313
Test flight of the profile F-100. Dec 3, 2010
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:50
Views : 1358
Attachment of the swing control line. A line guide constructed of thin wire is needed at the wing tip.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:45
Views : 1352
Completed F-100 profile model. Wing mounting platform and capture strips are also used for the wing mounting.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:40
Views : 1181
Horizontal tail slides onto fuselage platform.
Hangar Aircraft Category Date Preview
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:38
Views : 1155
Mounting platform for tail glued to fuselage. Corresponding capture strips attached to horizontal tail.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:36
Views : 1193
Gluing doublers for tail mounting platform. The wing and horizontal tail will be removeable on the F-100.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:34
Views : 1135
Test fit of parts.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:33
Views : 1146
Assembly of the wing and horizontal tail and nose doublers.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:31
Views : 1215
Parts of the profile F-100. Interlocking glue joints at the wing and tail.
simpleflyerDave Diels Engineering, Inc Kit #16, NA F-100 Super SabreBuild04-Feb-11 03:28
Views : 1131
Patterns for cutting the sheet wood are cut out.
Page (2 in total) :  <<  [ < Prev ]