I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (7 in total) :  1  [ 2 ]  3   4   5   6   7  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
jerry campbellDumas Kit #225, Messerschmitt 109 GReference27-Apr-11 11:13
Views : 678
It also provides paint chips.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild27-Apr-11 11:11
Views : 732
Sometime ago I ran across this Luftwaffe painting guide from a company called Iliad.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild27-Apr-11 11:10
Views : 621
Once the brass tubing is pushed into the balsa spinner backing providing a guide for the tubing it can be removed for painting of the gun and spinner.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild27-Apr-11 11:06
Views : 626
The spinner is drilled out to take a brass tubing representing the engine mounted 20mm cannon.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild18-Apr-11 17:32
Views : 690
Yes it is starting to look like a G-6 so maybe its time to go to the paint shop.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild18-Apr-11 17:30
Views : 663
The canopy can easilty be painted as the later Erla Haube Canopy or Galland Canopy as it was sometimes called.
Hangar Aircraft Category Date Preview
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild18-Apr-11 17:26
Views : 674
The Dumas vac canopy fits exceptionally well.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild18-Apr-11 17:24
Views : 617
The Bf 109G was getting heavier and hevier so begining with the G-2 the size of wheels and tires had to be increased which required bulges on the upper wing panels.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild18-Apr-11 17:19
Views : 669
Trial fitting the componets to see if it is starting to look like a Bf 109G-6.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild17-Apr-11 06:59
Views : 664
Begining with the Bf 109G-5 and continued thereafter, the fuselage mounted 7.9mm MG 17 machine guns were replaced with the heavier 13mm MG 131 machine guns which required a bulged housing for the cocking mechanisms. These were quickly labeled "Buele" by the pilots.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild17-Apr-11 06:40
Views : 670
The 109G required two small scoops on each side of the nose and the G-6, since it was unpressurized, required a small air ventilation scoop on each side just below the windscreen.
jerry campbellDumas Kit #225, Messerschmitt 109 GBuild17-Apr-11 06:34
Views : 640
After the HobbyLite is dry the surface is sanded smooth and another coat of HobbyLite is applied and again sanded, after which coats aof Aero Gloss Balsa Filler were added and sanded.
Page (7 in total) :  1  [ 2 ]  3   4   5   6   7  [ < Prev ] [ Next > ]