I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   8   9   10   11   12  [ 13 ]  14   15   16   17   18   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild28-Feb-15 17:06
Views : 422
With Gumby”s help a third type of pulley emerged. Functional in their design and construction, the sheaves on the Lego pulleys rotate.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild28-Feb-15 17:05
Views : 444
Now that they are all painted. We have a supply to meet all our cable direction needs for this builds and for those in the future.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aReference27-Feb-15 15:04
Views : 471
I shall miss thee Spock! RIP!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Feb-15 19:38
Views : 461
The Gumster managed to assemble the four pulleys that direct the aileron control cables over the upper and lower wing surfaces. Tomorrow he must assemble four slightly larger pulleys that mount slightly below the wing surfaces directing force from the ailerons to the wing mounted pulleys. He is on hos own tomorrow AM as I am off to the doctor for my annual physical examination. Looking forward or rearward to an unpleasant experience!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Feb-15 18:09
Views : 523
Gumby is in the spotlight of activity!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aFlying25-Feb-15 18:08
Views : 449
The sheeting of the ventral surface of the upper wing was also completed.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Feb-15 18:06
Views : 441
Attention was paid to alignment of the airfoils.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Feb-15 18:05
Views : 469
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked25-Feb-15 18:04
Views : 425
The BE 12a has visible pulleys that guide the aileron control cables, with their directional force, over the top surface of the upper wing and lower surface of the lower wing. In order for the ailerons to function the fabrication of 8 small pulleys is required. Here is the prototype that Gumby fabricated. Seven more pulleys are required.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Feb-15 17:09
Views : 415
There are some who missed seeing Gumby in yesterday’s posting. I was sure to include him in today’s activities. Gumby started his day with some engine maintenance.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Feb-15 17:08
Views : 438
Then with the aid of our test pilot “Slim”, they tried starting the engine.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked24-Feb-15 17:08
Views : 418
Page (32 in total) :  <<   8   9   10   11   12  [ 13 ]  14   15   16   17   18   >>  [ < Prev ] [ Next > ]