I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   11   12   13   14   15  [ 16 ]  17   18   19   20   21   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild13-Feb-15 17:30
Views : 416
Here Gumby applies the last bit of glue on the port side upper air foil.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aFlying13-Feb-15 17:29
Views : 494
Nice job my tiny amorphous friend, one completed, three to go!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild13-Feb-15 17:28
Views : 397
Tweaking a tight fit. All seems OK. Note the Gumby custom hard hat.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild13-Feb-15 17:27
Views : 379
After a wing slippage, the hard hat pays off. Gumby’s noodle is not damaged.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild13-Feb-15 17:27
Views : 435
Some times you get lucky. When we fabricated and installed the Vickers, we forgot about wing root location. As one can see we are lucky campers The lower wing should fit perfectly.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild12-Feb-15 16:33
Views : 406
The center section of the upper wing fits onto the cabane struts.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild12-Feb-15 16:32
Views : 424
With the construction and install of the air foils, it would be a nice time to have instructions, alas there are none. Must rely upon Gumby’s neurons and luck. The little minx is such the jokester he installed a boat prop to see if the QC department would notice his hijinks.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild12-Feb-15 16:30
Views : 387
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild12-Feb-15 16:30
Views : 403
Prepping for tomorrow’s wing ding thing. This is the first time we have encountered a plan where the upper and lower wing are printed over each other.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild12-Feb-15 16:29
Views : 403
The overlay of the wings precipitates carful thought and pragmatic construction in order to avoid an unnecessary screw up and rebuild.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild12-Feb-15 09:10
Views : 439
Every journey starts with the first step. "Lettuce", start wing fabrication....yipee!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild11-Feb-15 12:29
Views : 393
The “Fin” was numbered and epoxied to the fuse.
Page (32 in total) :  <<   11   12   13   14   15  [ 16 ]  17   18   19   20   21   >>  [ < Prev ] [ Next > ]