I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   15   16   17   18   19  [ 20 ]  21   22   23   24   25   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked03-Feb-15 17:47
Views : 349
The stabilizer awaits shaping and sealing.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:46
Views : 315
The feathers should be covered tomorrow.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:44
Views : 317
The “window” in the pit wall does light the pit interior.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild02-Feb-15 14:10
Views : 388
Well the Gumster is glad that this task is completed. The rudder is in the rough but the fin has been sanded and shaped. Gumby said that he should have both covered by the end of his work day tomorrow!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild01-Feb-15 12:40
Views : 378
My reference books have had photos of this tyre company’s name on a few British aeroplanes. Gumby decided to use there tyres on Ogre therefore the Palmer Cord Aero Tyre trademark was imprinted.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild01-Feb-15 12:40
Views : 380
Laminating balsa for the fin, the rudder lumber is still soaking.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild31-Jan-15 18:28
Views : 522
Gumby believes that I was slightly remiss yesterday when posting Vickers construction photos. At my little buddy’s request I am posting this photo, today. The fuselage mounted Vickers still reqires the interrupter “gear” linkage and an access port in the cockpit wall that enabled the pilot to cock the gun and provide the gun access to the ammunition belt.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild31-Jan-15 12:47
Views : 383
Does not look like much but progress non the less. Poly span applied to the remainder of the fuse. Gumby cannot keep is mind on task. All he can think of is the "Stupid Bowel"!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild30-Jan-15 16:58
Views : 434
A bit of gunsmithing was in Gumby’s job description this day. For those interested here is a photo of the basic components that he used on the Vickers.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild30-Jan-15 16:56
Views : 373
Gumby has not fabricated a Vickers in quite a while.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild30-Jan-15 16:55
Views : 381
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild30-Jan-15 16:54
Views : 403
The mg must be finished and mounted on Ogre.
Page (32 in total) :  <<   15   16   17   18   19  [ 20 ]  21   22   23   24   25   >>  [ < Prev ] [ Next > ]