Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (13 in total) :  1   2  [ 3 ]  4   5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustAerodromeRC PT Crop DusterBuild22-Jul-09 18:50
Views : 959
Some where in the hand crafted cherry and beech laminated blake, a duster prop resides. Now to try to set it free!
John M OshustAerodromeRC PT Crop DusterBuild22-Jul-09 18:49
Views : 1035
Partially free!
John M OshustAerodromeRC PT Crop DusterBuild17-Jul-09 16:40
Views : 1018
Right rigging completed.
John M OshustAerodromeRC PT Crop DusterBuild17-Jul-09 16:39
Views : 943
Left rigging complelted.
John M OshustAerodromeRC PT Crop DusterBuild17-Jul-09 16:38
Views : 1034
Wing mounted guages.
John M OshustAerodromeRC PT Crop DusterBuild15-Jul-09 08:16
Views : 1055
Magic box prop for a look see.
Hangar Aircraft Category Date Preview
John M OshustAerodromeRC PT Crop DusterBuild15-Jul-09 08:15
Views : 983
The rear wing rigging next
John M OshustAerodromeRC PT Crop DusterBuild15-Jul-09 08:14
Views : 1048
Rigging 2/3 complete
John M OshustAerodromeRC PT Crop DusterBuild12-Jul-09 16:26
Views : 1012
John M OshustAerodromeRC PT Crop DusterBuild12-Jul-09 16:25
Views : 965
1/3 of wing rigging completed. Music wire rigging snaps into place with Al tubing ferrules at each end of rigging wire. The ferrules mout on wire puns attached to the wing. This plane can be taken apart for ease of transport to the mini museum, then permanently assembled.
John M OshustAerodromeRC PT Crop DusterBuild10-Jul-09 17:41
Views : 1062
Ailerons completed.
John M OshustAerodromeRC PT Crop DusterBuild10-Jul-09 17:40
Views : 1008
Now on to the rigging.
Page (13 in total) :  1   2  [ 3 ]  4   5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]