Hangar |
Aircraft |
Category |
Date |
Preview |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 25-May-08 14:07 | | Views : 1493 | An AVG Tomahawk dives on a Nate of the 77th Sentai. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-May-08 11:17 | | Views : 1524 | The Nate was airbrushed with Tamiya acrylics. The white stripes on the fuselage and the blue stripes on the tail fin were masked and airbrushed, the red bird like figures were handpainted. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-May-08 11:10 | | Views : 1585 | The oil cooler mounted in the cowling behind the prop is made of painted bass wood. The pitot tube on the wing is bent wire with a piece of copper attached. The gunsight is a dowel with masking tape wrappings. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-May-08 10:57 | | Views : 1576 | The Nate is finally finished and the little details have been added. The wheels, which are plastic from the parts box, and pants turned out well. The exhaust is plastic tubing squeezed to shape with pliers and painted metallic gray. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 09-May-08 15:53 | | Views : 1518 | I replaced the the wooden wheels with some plastic wheels from the spares box, which had to be sanded to fit. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 09-May-08 15:48 | | Views : 1588 | A few extra stringers were added for strength and make papering a little easier. |
|
Hangar |
Aircraft |
Category |
Date |
Preview |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 09-May-08 15:44 | | Views : 1424 | The doping and sanding completed the major components are trial fitted. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 07-May-08 12:02 | | Views : 1379 | Plans, instructions and parts are provided for four different fixed landing gear. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 07-May-08 11:59 | | Views : 1339 | The fuselage, wing and tail feathers along with the cowling, are constructed, with the sanding and doping beginning. Care must be taken when joining the two halves of the wing together and adding dihedral. |
jerry campbell | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 04-May-08 16:12 | | Views : 1366 | The kit includes a full set of plans printed both sides, meatball decals, light strip wood, excellent esaki paper, clear vac canopy, 3 sheets of print wood, a small 3 vierw plan, and prop and rubber. Diels kits are desingned for rubber powered and have a |
|