Main Menu
User Login
View By Aircraft
Users Aircraft
|
Jetco Dayton-Wright RB-1 by pfinn. Viewed 1187 times.
Build Thread
|
|
|
Image Comments |
pfinn | 29-Jan-11 09:40 | Infilling selected areas between stringers. To make a pattern, I used non-flexible tape (Magic/removable) stuck down only to the two longerons to be filled between. Don't stretch tight. I used a small staightedge and adhered the tape to the edges center out to allow the tape to "Skew" (?) as the plane twisted. |
pfinn | 26-May-16 11:58 | Goldenboot, This is another way I did some infill and how I made some patterns for each length. Since I made my own bulkheads, I just marked the location of the stringers and thus left out the material between the stringers. With a kit, one could just cut away the "Between Material" after marking the locations on the bulkhead. Another example of this technique is in my BV 215 build. |
|
Please sign in to comment on this image.
|
|
|