I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft
Jetco Dayton-Wright RB-1 by pfinn. Viewed 1187 times.
Build Thread
Next Prev Click image to return.

Image Comments
pfinn29-Jan-11 09:40
Infilling selected areas between stringers. To make a pattern, I used non-flexible tape (Magic/removable) stuck down only to the two longerons to be filled between. Don't stretch tight. I used a small staightedge and adhered the tape to the edges center out to allow the tape to "Skew" (?) as the plane twisted.
pfinn26-May-16 11:58
Goldenboot, This is another way I did some infill and how I made some patterns for each length. Since I made my own bulkheads, I just marked the location of the stringers and thus left out the material between the stringers. With a kit, one could just cut away the "Between Material" after marking the locations on the bulkhead. Another example of this technique is in my BV 215 build.
Please sign in to comment on this image.