Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   885   886   887   888   889  [ 890 ]  891   892   893   894   895   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
rgoodScratch Built Handley Page HeyfordBuild05-Feb-15 10:36
Views : 913
The bulging crew section of the fuselage.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:13
Views : 800
Without the help of my little friend, I was not able to fully accomplish today’s fabrication goal. I did manage to construct and install an interrupter gear mechanism that will permit the Vickers to fire through a four bladed air screw. This mechanism synchronizes engine/airscrew rotation with Vickers discharge. Pictured here you can see how the linkage enters into the engine compartment.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:13
Views : 727
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:12
Views : 757
MG belts originally were canvas. Upon discharge the belt would get caught in the prop wash, flail about and cause the gun to jam. The belt chute appears on Aeroplanes prior to the adaptation of a disintegrating metal link belt. I like the chute so Ogre fires canvas belted ammo!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:09
Views : 750
I printed the roundel fuselage insignia, sanded them thin, allowed them to weather, and installed them. Looking at the photos in my reference booklet, weather and abused insignias were very common.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:08
Views : 734
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild04-Feb-15 17:07
Views : 769
Last on the day’s agenda, the feathers. I had hoped to have the frames covered with poly span this day, but time for cocktails arrived postponing covering until the morrow. The frames were sealed and are ready first thing tomorrow morn.
rgoodScratch Built Handley Page HeyfordBuild03-Feb-15 23:29
Views : 1001
Top plane completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:53
Views : 804
A lot of bits and pieces are falling together to complete the fuselage fabricating.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:51
Views : 796
Access ports from the cockpit to the MG were cut and the Vickers has been positioned with the wire mounting rods.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:50
Views : 768
A complete install of the Vickers is in queue.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild03-Feb-15 17:48
Views : 751
The feathers should be covered tomorrow.
Page (3344 in total) :  <<   885   886   887   888   889  [ 890 ]  891   892   893   894   895   >>  [ < Prev ] [ Next > ]