Hangar |
Aircraft |
Category |
Date |
Preview |
rayl | Scratch Built Loening OL-8 Amphibian | Build | 22-Jan-16 19:29 | |
Views : 501 |
Anothee view. Span is 40 inches (+ asmidge). |
rayl | Scratch Built Loening OL-8 Amphibian | Build | 22-Jan-16 19:25 | |
Views : 461 |
Top wing done. The plans that I am working off of did not have ailerons, so had to extrapolate/interpolate/WAG them; think that I'm pretty close. The wing center section/dihederal brace took most of the day (when I wasn't shoveling snow). |
rayl | Scratch Built Loening OL-8 Amphibian | Build | 20-Jan-16 11:55 | |
Views : 505 |
Nearly 200 individual parts here, Took a day and a half to git R done. The little pile in front are the puchings from the alignment tool. I think the next model will be Laser-cut. |
rayl | Scratch Built Loening OL-8 Amphibian | Build | 18-Jan-16 23:15 | |
Views : 467 |
There are about 15 rib blanks clamped in the patterns. The red edge, applied with a sharpy, is a warning stripe to let me know if I have gone to far. I roughed the shape out with my drum sander then used a fairing board to refine the ribs. The notches were roughed out with a razor saw then refined with a small bastard file. |
rayl | Scratch Built Loening OL-8 Amphibian | Build | 18-Jan-16 23:04 | |
Views : 471 |
About 1/3 of teh rib blanks in waiting. |
rayl | Scratch Built Loening OL-8 Amphibian | Build | 18-Jan-16 23:03 | |
Views : 462 |
With about 80 full size ribs to cut out of 1/16" sheet, Imade a jig out of 1/8" lite-ply to insure consistent results. There are two 6-32 stove-bolts to clamp the rib blanks between the patterns. The thingy to the left is a piece of 1/8" O.D. brass tube with the inside sharpened with a countersink which should make some nice holes in the rib blanks using the pattern jig in front. |