I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (29 in total) :  <<   22   23   24   25   26  [ 27 ]  28   29  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild17-Jan-15 09:49
Views : 527
Bottom sheeting instaled on the wings and the elevons attached. Now I'm ready to finsih the fuse planking and move on to the sealer/primer stage.
raylScratch Built Consolidated XF-92ABuild17-Jan-15 09:44
Views : 572
Main gear wells done. Ready to sheet the bottom of the wings.
raylScratch Built Consolidated XF-92ABuild17-Jan-15 09:42
Views : 506
My new freind in Monterey, Ca.
raylScratch Built Consolidated XF-92ABuild14-Jan-15 11:23
Views : 505
Started on the main L/G wells. A few strips to simulate the stringers and faux spars to close off the space.
raylScratch Built Consolidated XF-92ABuild14-Jan-15 11:21
Views : 565
TOps of the wings are sheeted. Had to see what it looked like with them on.
raylScratch Built Consolidated XF-92ABuild12-Jan-15 14:58
Views : 525
Before I start to sheet the wings, I have to fabricate the wheel wells in the wing. I fabbed a wheel of the correct size on my drill press to check for the well size and clearances, even though the gear will be non-functional. Just kinda fun to whip something like this out.
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild12-Jan-15 14:54
Views : 488
A better shot of how the main L/G is mounted into the fuse. The L/G will be cross-pinned through the 1/4" ply bulkheads when I get that far. Once I test mounted the wings the actual size of this model suprissed me.
raylScratch Built Consolidated XF-92ABuild12-Jan-15 14:51
Views : 514
OK. The wings are started, they will be sheeted with 1/16" hard stock. The main gear wheels are starting to take shape. Again, there just are not many photos of this A/C to work from so any "rivet counters" ou there will have a hay-day with the wells.
raylScratch Built Consolidated XF-92ABuild10-Jan-15 10:08
Views : 489
After a cup of coffee and muttering a few choice phrases, I tried my luck on the lathe again: success! I had to laminate a poplar wood blank to make the Afterburner cone due to it's height. Turned out pretty good if I say so myself. THese will be attached later after all the planking is completed and the Exhaust duct/flame-holder has been fabricated and installed.
raylScratch Built Consolidated XF-92ABuild10-Jan-15 10:00
Views : 515
The finished master with my first attempt at forming the canopy. This is a totaaly new process to me: SLip the form into a soft-drink 2 liter bottle that has been cut off at both ends then apply heat from a heat gun and teh plastic magically shrinks the shape of the master. Cool!
raylScratch Built Consolidated XF-92ABuild10-Jan-15 09:57
Views : 457
Next project is to carve the master for the canopy. I used Basswod that I picked up at the local big-box home improvement store. This is a progress shot about a 1/2 hour into the process.
raylScratch Built Consolidated XF-92ABuild10-Jan-15 09:54
Views : 512
Here are completed main gears. They need to be cleaned up a little now. The grand plan is to leave these in this form until I have them mounted in the airframe and trued up then I will guzzie them up with plastruct tubing and othe do-dads to give them the correct appearance.
Page (29 in total) :  <<   22   23   24   25   26  [ 27 ]  28   29  [ < Prev ] [ Next > ]