Hangar |
Aircraft |
Category |
Date |
Preview |
moostang51 | Guillows Series 2000 - B-24 Liberator | Parked | 01-Jul-07 18:21 | | Views : 1760 | A few possible paint schemes. Jerk's Natural is the detailing provided by Guillow's. I like the Green Dragon at the bottom. Lot's of masking though. |
moostang51 | Guillows Series 2000 - B-24 Liberator | Build | 01-Jul-07 17:53 | | Views : 1972 | Little bit more of everything, some nacelles and partial fuselage covering. Rudders still in progress, going with solid carved main and tissue covered flap. |
John M Oshust | Scratch Built MiG3 | Aerial | 01-Jul-07 14:41 | | Views : 769 | The contol room if a submarine, the instrument panel, if a plane. The detailing begins. |
jgood | Guillows Series 200 - Fokker DR-1 Triplane | Build | 01-Jul-07 10:34 | | Views : 1001 | Topwing aileron actuators. The ailerons are glued to the metal rod, and pushing and pulling the end of the torque rod moves the aileron up and down. |
jgood | Guillows Series 200 - Fokker DR-1 Triplane | Build | 01-Jul-07 10:30 | | Views : 949 | Showing the lightened horizontal tail feathers. They will be operated by a pull-pull cable system, for maximum lightness. |
David Duckett | Guillows Series 800 - B-25 Mitchell | Build | 01-Jul-07 07:32 | | Views : 3071 | For Doodle- use hinges. This is the method Guillows uses and it's common for all their kits. A different method is used if the control surfaces are to be functional, that is for a flying model. |
|
Hangar |
Aircraft |
Category |
Date |
Preview |
jernst | Dave Diels Engineering, Inc Kit #30, Brewster F2A Buffalo | Build | 01-Jul-07 06:46 | | Views : 1536 | Sheeting the nose section begins next |
jernst | Dave Diels Engineering, Inc Kit #30, Brewster F2A Buffalo | Build | 01-Jul-07 06:46 | | Views : 1452 | Wings are built - butt joint to fuselage |
John M Oshust | Scratch Built MiG3 | Build | 30-Jun-07 20:55 | | Views : 788 | Boris misses his Camel, but likes the "New Ride!" |
John M Oshust | Scratch Built MiG3 | Build | 30-Jun-07 20:54 | | Views : 732 | Gentlemen remember me? We are 40 hours into the scratch built Mig-3. My Boss says that now the "fun work" of detailing the fuselage will begin. This is a modified Mig published by E Sthal in 1943. Larger scale, bass, not balsa. |
jernst | Dave Diels Engineering, Inc Kit #30, Brewster F2A Buffalo | Parked | 30-Jun-07 06:19 | | Views : 1426 | It took about 2 hrs to add all the stringers. |
jernst | Dave Diels Engineering, Inc Kit #30, Brewster F2A Buffalo | Build | 30-Jun-07 06:18 | | Views : 1025 | This is my current project. Span is 17.5 in. Stab is two piece that fits into slots at the rear keels |
|