I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3314 in total) :  <<   3043   3044   3045   3046   3047  [ 3048 ]  3049   3050   3051   3052   3053   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorParked01-Jul-07 18:21
Views : 1760
A few possible paint schemes. Jerk's Natural is the detailing provided by Guillow's. I like the Green Dragon at the bottom. Lot's of masking though.
moostang51Guillows Series 2000 - B-24 LiberatorBuild01-Jul-07 17:53
Views : 1972
Little bit more of everything, some nacelles and partial fuselage covering. Rudders still in progress, going with solid carved main and tissue covered flap.
John M OshustScratch Built MiG3Aerial01-Jul-07 14:41
Views : 769
The contol room if a submarine, the instrument panel, if a plane. The detailing begins.
jgoodGuillows Series 200 - Fokker DR-1 TriplaneBuild01-Jul-07 10:34
Views : 1001
Topwing aileron actuators. The ailerons are glued to the metal rod, and pushing and pulling the end of the torque rod moves the aileron up and down.
jgoodGuillows Series 200 - Fokker DR-1 TriplaneBuild01-Jul-07 10:30
Views : 949
Showing the lightened horizontal tail feathers. They will be operated by a pull-pull cable system, for maximum lightness.
David DuckettGuillows Series 800 - B-25 MitchellBuild01-Jul-07 07:32
Views : 3071
For Doodle- use hinges. This is the method Guillows uses and it's common for all their kits. A different method is used if the control surfaces are to be functional, that is for a flying model.
Hangar Aircraft Category Date Preview
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloBuild01-Jul-07 06:46
Views : 1536
Sheeting the nose section begins next
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloBuild01-Jul-07 06:46
Views : 1452
Wings are built - butt joint to fuselage
John M OshustScratch Built MiG3Build30-Jun-07 20:55
Views : 788
Boris misses his Camel, but likes the "New Ride!"
John M OshustScratch Built MiG3Build30-Jun-07 20:54
Views : 732
Gentlemen remember me? We are 40 hours into the scratch built Mig-3. My Boss says that now the "fun work" of detailing the fuselage will begin. This is a modified Mig published by E Sthal in 1943. Larger scale, bass, not balsa.
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloParked30-Jun-07 06:19
Views : 1426
It took about 2 hrs to add all the stringers.
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloBuild30-Jun-07 06:18
Views : 1025
This is my current project. Span is 17.5 in. Stab is two piece that fits into slots at the rear keels
Page (3314 in total) :  <<   3043   3044   3045   3046   3047  [ 3048 ]  3049   3050   3051   3052   3053   >>  [ < Prev ] [ Next > ]