Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   895   896   897   898   899  [ 900 ]  901   902   903   904   905   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Jan-15 12:00
Views : 745
Sanding and shaping. Every task needs a supervisor. Happily i get to watch Gumby toil!
David DuckettDumas Kit #233. MiG 17Build20-Jan-15 04:10
Views : 4530
Covering is complete and it's now ready for several coats of dope and painting.
David DuckettDumas Kit #233. MiG 17Build20-Jan-15 04:09
Views : 4598
The wings have been glued on with spacers under each wing tip. The fin is now glued in place with the bottles insuring proper alignment.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild19-Jan-15 17:56
Views : 813
Gumby did some wood working this day. Tomorrow sand to shape and seal.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild19-Jan-15 17:55
Views : 752
Some sheeting and some planking.
BriandKilbyGuillows Series 500 - SpitfireBuild18-Jan-15 14:59
Views : 804
working on the m-10!
Hangar Aircraft Category Date Preview
BriandKilbyGuillows Series 500 - SpitfireBuild18-Jan-15 14:58
Views : 819
front
BriandKilbyGuillows Series 500 - SpitfireBuild18-Jan-15 14:58
Views : 801
olive drab exterior, flat white interior.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Jan-15 14:34
Views : 786
The completion of the framing and covering of the fuse should keep the Gumster occupied for a couple of work periods. Enough construction today, time for playoff football!
BriandKilbyGuillows Series 500 - SpitfireBuild18-Jan-15 14:17
Views : 840
i decided to build the comet spitfire that i graciously got from poppy before i build my f-4.
raylScratch Built Consolidated XF-92ABuild18-Jan-15 10:18
Views : 1096
The great speckled bird! Two things happened: (1) My planking powress is lacking: many voids between the planks to fill. (2) I suffered some sort of incomparability issue between the intial finish and the high-fill primer, resulting in may "Crazed" areas. This is going to take a while as the primer surface has to nearly perfect if I am to lay on a aluminum finish coat. Catchya later!
raylScratch Built Consolidated XF-92ABuild18-Jan-15 10:12
Views : 970
Finished all of the fuse planking. Installed 1/64" ply main L/G well inserts. I did this to simulate the thin edges of the wheel wells. I have three layers of sandinig sealer on the fuse now so the next step will be to lay on some automotive type high-fill primer.
Page (3344 in total) :  <<   895   896   897   898   899  [ 900 ]  901   902   903   904   905   >>  [ < Prev ] [ Next > ]