Hangar |
Aircraft |
Category |
Date |
Preview |
mark eggebeen | Guillows Series 2000 - B17 Flying Fortress | Build | 20-Sep-21 23:12 | |
Views : 411 |
interesting addition to the ribs that will receive the wing rails |
edbecky | Guillows Series 400 - BF 109 | Build | 20-Sep-21 10:44 | |
Views : 474 |
This is my first work on model since IDA 23 days ago. Had to rearrange building layout due to damage to ceiling. After we get our new roof I'm going to empty my office (building area) for ceiling work. Very fortunate to have power back and be able to work on models once more. |
edtherenderman | Scratch Built Bugatti 100P | Build | 20-Sep-21 08:49 | |
Views : 270 |
View from top |
edtherenderman | Scratch Built Bugatti 100P | Build | 20-Sep-21 08:48 | |
Views : 311 |
Port side view of fuse progress from Saturday and Sunday. Framing 90% complete. So far my plans have worked really well, if a little overbuilt. I did have a little interference issues with some of the parts, but nothing that wasn’t easily worked out with a little cutting. I’m pretty happy with the plans and build so far! |
edtherenderman | Scratch Built Bugatti 100P | Build | 20-Sep-21 08:45 | |
Views : 289 |
Work begins in earnest on the Bugatti! Went through the five step workflow of converting my plans to something my 2D laser etcher could use (1. In Photoshop, cut and paste parts to a drawing the size of the balsa, 2. Fill parts in black and save as TIFF, 3. Open file in InkScape, convert to vector graphics and save as DXF file, 4. Open file in LibraCAD, scale drawing and save as version of DXF that the next tool can use, 5. Open file in BenCutLaser, assign cutting tools and send drawing to Laser etcher to cut the parts). This is the first part being cut by the laser. Took about 4 hours to cut all the fuse and wing parts. |
mark eggebeen | Guillows Series 2000 - B17 Flying Fortress | Build | 19-Sep-21 22:31 | |
Views : 378 |
ready to start another one |