| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 25-Jun-09 18:47 |  | | Views : 992 | | Full span-right wing. |
| poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:12 |  | | Views : 1084 | | Another 37" will be added to complete full wingspan. |
| poppy | Eureka Boeing B-29 | Build | 23-Jun-09 18:11 |  | | Views : 1082 | | Test fit of wing sections. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:20 |  | | Views : 1060 | | 3/16" spars added mainly to keep balsa skins from sagging. Inner wings are 20 1/2" inside to outside ribs. Outer wing panel will be 18 1/2" and is removable. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:17 |  | | Views : 1009 | | Nacelles frames finished and attached to wing. |
| poppy | Eureka Boeing B-29 | Build | 21-Jun-09 18:16 |  | | Views : 1002 | | Port inner wing frame done. Test fit of engine nacelles. |
|
| Hangar |
Aircraft |
Category |
Date |
Preview |
| poppy | Eureka Boeing B-29 | Build | 18-Jun-09 15:40 |  | | Views : 1221 | | For scale. The handsome guy is 5'9"". |
| poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:26 |  | | Views : 1092 | | 1/4" basswood splice joiner. 1/4"X1/4" basswood braces added. They aren't pretty but they do the job. |
| poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:24 |  | | Views : 1043 | | Both halves joined and glued in place. |
| poppy | Eureka Boeing B-29 | Build | 16-Jun-09 11:24 |  | | Views : 1056 | | Rear fuselage fully skinned. Open area is for stab. installation. Stabs span 27". |
| poppy | Eureka Boeing B-29 | Build | 12-Jun-09 14:26 |  | | Views : 1092 | | Fin sheeted with 1/16" balsa. |
| poppy | Eureka Boeing B-29 | Build | 12-Jun-09 14:26 |  | | Views : 1056 | | Some fuselage skins done and vertical braces added to fin. |
|