Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (146 in total) :  <<   81   82   83   84   85  [ 86 ]  87   88   89   90   91   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
poppyEureka Boeing B-29Build16-Jun-09 11:24
Views : 804
Both halves joined and glued in place.
poppyEureka Boeing B-29Build16-Jun-09 11:24
Views : 798
Rear fuselage fully skinned. Open area is for stab. installation. Stabs span 27".
poppyEureka Boeing B-29Build12-Jun-09 14:26
Views : 880
Fin sheeted with 1/16" balsa.
poppyEureka Boeing B-29Build12-Jun-09 14:26
Views : 824
Some fuselage skins done and vertical braces added to fin.
poppyEureka Boeing B-29Build03-Jun-09 15:26
Views : 925
Two halves joined for "fun", not glued. My wife's comment " we need a bigger house".
poppyEureka Boeing B-29Build03-Jun-09 15:25
Views : 730
1/8" basswood strengthners added to top keel to keep alighnment. Note it is smaller than the lower keel.
Hangar Aircraft Category Date Preview
poppyEureka Boeing B-29Build03-Jun-09 15:21
Views : 780
Rear Fuselage frame completed.
poppyEureka Boeing B-29Reference01-Jun-09 21:52
Views : 844
FIFI's main gear.
poppyEureka Boeing B-29Reference01-Jun-09 21:51
Views : 788
FIFI's supercharger parts.
poppyEureka Boeing B-29Reference01-Jun-09 21:50
Views : 826
poppyEureka Boeing B-29Reference01-Jun-09 21:49
Views : 992
"FIFI" based at CAF Midland, TX. Undergoing extensive maintenance.
poppyEureka Boeing B-29Build31-May-09 19:44
Views : 861
Got a bit done today. The kit supplied wood is 1/8" and is in excellent condition after 50+ yrs. Soaked in warm water for 10 min. to get it to curve. Front fuselage half almost complete. Rear half is next. This is like building 2 kits.
Page (146 in total) :  <<   81   82   83   84   85  [ 86 ]  87   88   89   90   91   >>  [ < Prev ] [ Next > ]