I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   22   23   24   25   26   27   28   29   30   31   32  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Mar-14 13:27
Views : 353
One more day and the cylinders should be completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Mar-14 13:26
Views : 386
Gumby has already started the intake manifold.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked25-Mar-14 12:57
Views : 322
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked25-Mar-14 12:55
Views : 317
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Mar-14 12:54
Views : 349
Gumby did some calculations. When both banks of cylinders are finished, the cylinders alone will contain 504 components.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Mar-14 12:52
Views : 395
This bank of cylinders is completed.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Mar-14 12:41
Views : 380
The shaping of the cylinders is complete.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Mar-14 12:40
Views : 332
Now the valve train detailing begins.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Mar-14 12:39
Views : 382
This stage complete, on to the other cylinder bank.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Mar-14 17:26
Views : 421
The Gumster torques a bolt for a cylinder test fit. He fabricated a new crankcase today and the redesign worked better than expected.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Mar-14 17:25
Views : 348
The basic shaping of the cylinder set is not yet completed but Gumby put a quick coat of paint on them and hastily installed them into the crankcase for a “look see”. He has been at engine construction for over a week and there is quite a bit of work remaining. That’s why I pay him well over minimum wage. Model fabrication pays better than making burgers at Burger King!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked22-Mar-14 17:46
Views : 408
Page (32 in total) :  <<   22   23   24   25   26   27   28   29   30   31   32  [ < Prev ] [ Next > ]