Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (1 in total) :  <<  [ < Prev ]
Hangar Aircraft Category Date Preview
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateParked08-Nov-21 14:46
Views : 1091
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateParked08-Nov-21 14:45
Views : 1183
Finished
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateBuild21-Oct-21 18:38
Views : 1199
One more light application of spackling will be added and then sanded smooth which will make it all ready to dope.
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateBuild21-Oct-21 18:35
Views : 1101
adfter drying overnight, sand with 220 wet/dry sandpaper. Two applications are needed for such shapes.
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateBuild21-Oct-21 18:33
Views : 1073
The space between the fuselage and wing were filled with scraps and the pattern taped.
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateBuild21-Oct-21 18:32
Views : 1075
Wing infill is 1/16' stock bottom, 3/32" top
Hangar Aircraft Category Date Preview
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateBuild21-Oct-21 18:27
Views : 1059
Fuselage infill is 3/32" stock.
David DuckettDave Diels Engineering, Inc Kit #27, Nakajima Ki27 NateBuild21-Oct-21 18:26
Views : 1039
Sandpaper is your friend
Page (1 in total) :  <<  [ < Prev ]