|
Hangar |
Aircraft |
Category |
Date |
Preview |
John M Oshust | ManzanoLaser Spad XIII | Build | 02-Nov-08 16:30 |  | Views : 731 | Just when I get the procedure down pat, they process is over....that is until the next time! |
John M Oshust | ManzanoLaser Spad XIII | Build | 02-Nov-08 16:26 |  | Views : 751 | I spent today installing the rigging..... music or piano wire. |
John M Oshust | ManzanoLaser Spad XIII | Build | 01-Nov-08 18:11 |  | Views : 689 | The wings need wire! |
John M Oshust | ManzanoLaser Spad XIII | Build | 01-Nov-08 18:09 |  | Views : 720 | The wire rigging, masybe some panel lines, some little jimmies and jammies and this adventure will be over. Oh...a new larger improved prop! |
John M Oshust | ManzanoLaser Spad XIII | Build | 01-Nov-08 18:07 |  | Views : 708 | Roundel on the right is the marking that appeared on this bird. The left roundel design was adopted right after WW1. I prefer the left roundel and will bend history a tad. It could have appeared on this plane as it toured the US after the war. |
John M Oshust | ManzanoLaser Spad XIII | Build | 01-Nov-08 18:04 |  | Views : 708 | The clamps, metal measuring stick and epoxy worked. Five minute epoxy did rush the alignment process a bit. |
|