I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (19 in total) :  <<   7   8   9   10   11   12   13   14   15   16   17   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustScratch Built MiG3Build07-Aug-07 22:39
Views : 726
Wing root temp attached to eyeball the fit. The wood part of the wings, colorful clamps from a good friend, recommended reading material.
John M OshustScratch Built MiG3Build07-Aug-07 22:36
Views : 679
They had to see what the wings will look like...no dihedral as yet.
John M OshustScratch Built MiG3Build07-Aug-07 21:26
Views : 642
They detached the wings from the wing root. The wings will be planked with bass, the root attached to the fuselage and covered with aluminum. Two workers, two projects, we have not decided who does what!
John M OshustScratch Built MiG3Build06-Aug-07 21:07
Views : 687
They came home from school with this. Sasha wants to get his flippers wet with an inexpensive and indestructible, they hope, RC plane.
John M OshustScratch Built MiG3Build06-Aug-07 20:55
Views : 650
Removed from the paper the left and right wings match almost perfectly. Now as a pair they can be filed, dremmeled and sanded to a perfect match.
John M OshustScratch Built MiG3Build06-Aug-07 20:02
Views : 693
Original plan has 8 sentences in wing construction. Very open ended. That is a 1 ft metal ruler under the fuselage in front of the wing. 5.5 hrs of progress today, a lot to go but I am happy to be back at the build!
Hangar Aircraft Category Date Preview
John M OshustScratch Built MiG3Build06-Aug-07 19:59
Views : 608
Many changes, and I hope, improvements to the original wing plan. Length, width, and dimnesional size of the building material was altered.
John M OshustScratch Built MiG3Build06-Aug-07 19:56
Views : 669
The start of wing construction.
John M OshustScratch Built MiG3Build01-Aug-07 18:17
Views : 700
Cleaned the workshop for wing production. Made a new building board to fit the wings. I had to enlarge the original wing plane to give a wing to fuselage ratio exactly like the real Mig. Off to the hills to rape and pillage for a few days!
John M OshustScratch Built MiG3Build01-Aug-07 18:14
Views : 662
Learned colleagues, tow coats of sealer, the second not yet sanded. Is this baby behind yet?
John M OshustScratch Built MiG3Build30-Jul-07 19:56
Views : 667
Initial fitting of the wings seem to indicate that they are very close to the "Real Thing". The fillets do not appear. I may widen the wing root a tad. The trailing edge of the Mig almost extends to the rear of the canopy. Computers, great resource. P
John M OshustScratch Built MiG3Build30-Jul-07 19:02
Views : 693
Today marks 99 hrs into this bird. This is what I have to show for the time. Tonight I will enlarge and print the wing plans.
Page (19 in total) :  <<   7   8   9   10   11   12   13   14   15   16   17   >>  [ < Prev ] [ Next > ]