I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   16   17   18   19   20   21   22   23   24   25   26   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild28-Jan-15 16:00
Views : 412
Some planes in the BE series had cockpit windows. Though the window’s exact purpose is not definitely known, providing the pilot some sort of downward visibility has been proposed. Gumby thought the window a cute idea, therefore Ogre has a window.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild28-Jan-15 16:00
Views : 355
The ventral side of the engine pit had the metal on the fuselage modified to accommodate crank case shape and Oil pump. The Gumster thought one would benefit Ogre’s form.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild28-Jan-15 15:56
Views : 386
Engine compartment covered.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild28-Jan-15 15:55
Views : 455
Progress as of this day.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 15:13
Views : 381
Looking forward to fabricating armament!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 15:11
Views : 375
Productive day. Stormzilla tracked farther to the east. We were spared stormaggedon, only 6 inches. Gumby put the finishing touches on the cockpit. All it needs now is a windscreen.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 15:04
Views : 373
Just call Gumby “Tin Knocker” He covered almost everything before running out of petrol.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 10:37
Views : 350
Misson accomplished, only needs a windscreen.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 14:55
Views : 389
Well Gumby started the slow and tedious process of fuselage decorating. He wanted to accomplish more but I have him outside shoveling snow. With the amount of snow that is anticipated and the size of his snow shovel, he should be occupied for quite some time!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked26-Jan-15 14:54
Views : 355
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 14:53
Views : 322
Not completed but getting there!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 11:23
Views : 378
rayl...Maybe this will clarify the dashboard. A trip to a craft store for jewelry rings and rubber “O” rings for a bezel, instrument graphics, and nail polish to build up a lens.
Page (32 in total) :  <<   16   17   18   19   20   21   22   23   24   25   26   >>  [ < Prev ] [ Next > ]