I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (24 in total) :  1   2   3   4   5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 2000 - B-29 Super FortressBuild01-Apr-13 07:42
Views : 845
David DuckettGuillows Series 2000 - B-29 Super FortressBuild01-Apr-13 07:42
Views : 728
A few lines.....
David DuckettGuillows Series 2000 - B-29 Super FortressBuild29-Mar-13 22:19
Views : 686
One of two new pair of glasses. These are for close work. I was amazed!!
David DuckettGuillows Series 2000 - B-29 Super FortressBuild24-Mar-13 07:31
Views : 782
I drew on a centerline LIGHTLY with a pencil and measured where things should be. Then I used one of the plastic bomb bay doors from the kit as a template to draw on the doors.Next I used a regular piece of paper, which has perfect 90* angles, with one edge taped on the centerline to establish where the line going around the fuselage is.I marked lightly with lencil about three guide marks and then used a piece of flexible plastic to draw on the line. Lines. With these lines as reference the ones remaining to be added will be easier to establish.
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 21:32
Views : 812
My helper holds the wing down while the CA sets up.....
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 21:30
Views : 816
The landing gear doors were cut from the bottom engine nacelle before it was assembled. To reattach I "hung" them with a short piece of masking tape taped to the backside of the door and that allows enough support so the door can then be braced a bit with a finger inside the nacelle while a small amount of CA is applied to the junction. As soon as it cures enough to hold by itself a short piece of styrene rod was laid on the junction. The CA is still wet enough to hold the rod in place but I gave it an overall application just to make sure. You can see how it blends in. I've used this method before and I would prefer to hide the rod but this time I couldn't.
Hangar Aircraft Category Date Preview
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 10:16
Views : 738
Styrene rod glued to junction of landing gear door and engine nacelle
David DuckettGuillows Series 2000 - B-29 Super FortressBuild21-Mar-13 10:12
Views : 711
David DuckettGuillows Series 2000 - B-29 Super FortressBuild20-Mar-13 07:07
Views : 681
http://www.vintagewings.ca/VintageNews/Stories/tabid/116/articleType/ArticleView/articleId/35/language/en-CA/The-Untold-Story-of-Patriot-Jesse-O-Williams.aspx
David DuckettGuillows Series 2000 - B-29 Super FortressBuild16-Mar-13 07:38
Views : 824
Props are assembled and painted and the painting of the "greenhouse" is finished.
David DuckettGuillows Series 2000 - B-29 Super FortressBuild16-Mar-13 07:36
Views : 700
The section below the windows was covered with silkspan and given a couple of coats of clear dope. I used Pactra masking tape for all but the very front of the canopy and the entire process was spread over 4 days. Here light green is applied first and will be followed by three coats of gray and then two coats of thye gray with iridescent silver added.
David DuckettGuillows Series 2000 - B-29 Super FortressBuild14-Mar-13 21:20
Views : 673
Page (24 in total) :  1   2   3   4   5   6   7   8   9   10   11   >>  [ < Prev ] [ Next > ]