I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   5   6   7   8   9   10   11   12   13   14   15   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked11-Mar-15 19:18
Views : 514
Gumby prepares the center upper plane section for finishing tomorrow.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Mar-15 17:15
Views : 550
The starboard and port lower main planes have hinged ailerons and are epoxied to the fuselage. The starboard and port upper main planes have hinged ailerons.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Mar-15 17:15
Views : 512
Bracing wires installed on the upper surfaces of the port and starboard horizontal stabilizer.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Mar-15 17:13
Views : 531
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Mar-15 17:12
Views : 504
Bracing wires installed on the lower surfaces of the horizontal stabilizer.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Mar-15 17:11
Views : 474
Bracing wires installed on the cabane struts. Note: The bracing wires make a world of difference to strength and stabilization of the structure.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Mar-15 17:40
Views : 657
We lied regarding a mundane work day this day. After a trip outside, to procure a libation suitable for our cocktail hour, we were invigorated by the Spring like conditions. The lower airfoils, wings, or lower planes are in the hands of the epoxy molecules. With the aroma of polymerization and crosslinking tainting the spring air, Ogre takes a giant step to his completion.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Mar-15 13:59
Views : 561
Wow 58 degrees here today. There is a light at the end of winter’s tunnel. Hoping, however, that the light is not that of a locomotive! A day of preparing for greater accomplishments to come. Interpreting the complex rigging diagrams and the installation of 44 eyelets to make the eventual rigging task a tad more palatable. Here is where the experience from my Jenny build pays off.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild08-Mar-15 15:59
Views : 598
Well a day where if you close your eyes it feels somewhat spring like outside. Mr. G tried out an air screw and added bracing wires to the LG.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aFlying08-Mar-15 15:58
Views : 540
The roundels AKA German practice targets, are permanently attached and weathered.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild08-Mar-15 15:57
Views : 538
I started weathering the airfoils.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild08-Mar-15 15:55
Views : 512
Ogre may receive permanent lower air foils tomorrow. Getting a handle on the complex rigging wire pattern is a problem. None of my reference diagrams or photographs show a clear pattern.
Page (32 in total) :  <<   5   6   7   8   9   10   11   12   13   14   15   >>  [ < Prev ] [ Next > ]