I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (14 in total) :  <<   5   6   7   8   9   10   11   12   13   14  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
raylScratch Built Loening OL-8 AmphibianBuild22-Jan-16 19:25
Views : 418
Top wing done. The plans that I am working off of did not have ailerons, so had to extrapolate/interpolate/WAG them; think that I'm pretty close. The wing center section/dihederal brace took most of the day (when I wasn't shoveling snow).
raylScratch Built Loening OL-8 AmphibianBuild20-Jan-16 11:55
Views : 460
Nearly 200 individual parts here, Took a day and a half to git R done. The little pile in front are the puchings from the alignment tool. I think the next model will be Laser-cut.
raylScratch Built Loening OL-8 AmphibianBuild18-Jan-16 23:15
Views : 422
There are about 15 rib blanks clamped in the patterns. The red edge, applied with a sharpy, is a warning stripe to let me know if I have gone to far. I roughed the shape out with my drum sander then used a fairing board to refine the ribs. The notches were roughed out with a razor saw then refined with a small bastard file.
raylScratch Built Loening OL-8 AmphibianBuild18-Jan-16 23:04
Views : 424
About 1/3 of teh rib blanks in waiting.
raylScratch Built Loening OL-8 AmphibianBuild18-Jan-16 23:03
Views : 411
With about 80 full size ribs to cut out of 1/16" sheet, Imade a jig out of 1/8" lite-ply to insure consistent results. There are two 6-32 stove-bolts to clamp the rib blanks between the patterns. The thingy to the left is a piece of 1/8" O.D. brass tube with the inside sharpened with a countersink which should make some nice holes in the rib blanks using the pattern jig in front.
raylScratch Built Loening OL-8 AmphibianBuild17-Jan-16 14:13
Views : 510
Assenblage of parts waiting to be doped and tissue applied. IT was (-)22 deg. F. overnight and is going to get up to (-) 8 deg. today: the dopeing can wait. Besides I have to get ready to watch the Steelers wump the Broncos.
Hangar Aircraft Category Date Preview
raylScratch Built Loening OL-8 AmphibianBuild17-Jan-16 14:11
Views : 462
One of two wingfloats. 3 coats of nitrate dope.
raylScratch Built Loening OL-8 AmphibianBuild14-Jan-16 14:08
Views : 457
Wet forming the turtle-deck out of 1/16 balsa. I'm trying to keep going without having to tackle the L/G.
raylScratch Built Loening OL-8 AmphibianBuild14-Jan-16 14:06
Views : 442
Stabeliser ready to cover. Bulit it one piece to sumplify getting the "ribs" all going in the same direction. Went through a bit of angst yesterday when my plans didn't correlate to the William Nye drawing I was using to fine tune the construction. IT turns out that I was having a brain fart trying to get things to the scale.
raylScratch Built Loening OL-8 AmphibianReference14-Jan-16 11:10
Views : 528
Another one for DD.
raylScratch Built Loening OL-8 AmphibianReference14-Jan-16 11:09
Views : 517
For DD.
raylScratch Built Loening OL-8 AmphibianBuild08-Jan-16 18:06
Views : 419
Boat-tail and strakes on the hull bottom. Still need to apply the sheer-strakes, then on to the L/G (Ugh). Be back next week.
Page (14 in total) :  <<   5   6   7   8   9   10   11   12   13   14  [ < Prev ] [ Next > ]