I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 12:00
Views : 579
We had intended to start the install of the flight wires and bracing rigging this day. However this was not the case. The design committee decided that it would be prudent to address the lift mechanism issue for the Lewis guns. The install of the mechanism would be hindered by the rigging wiring. As stated in the Windsock data booklet, “the lever used to actuate the lift mechanism could be found in a railroad track switch!” Here is what Gumby and I fabricated this day. We were able to utilize one of the pulleys that were made for this build. Lewis guns in the firing position.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:59
Views : 600
Lewis guns lowered.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:58
Views : 591
Machine gun lift mechanism completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Mar-15 11:57
Views : 550
Machine gun lift mechanism finished.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:58
Views : 656
A big day in little Ogre’s life that being permanent wings.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:54
Views : 640
The epoxy molecules have once again worked their magic.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:53
Views : 691
Ogre’s 106.68 cm. upper wing span defines the limit to the shop work table.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:52
Views : 610
Now onward to the flight and bracing wires!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:02
Views : 593
Four areas remain inn Ogre’s compltetion: 1. Organize and tidy the shop. 2. Install the flight and rigging wires. 3. Connect the aileron linkages and cables. 4. Fabricate and install the airscrew.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:02
Views : 516
The little shop is vacuumed and organized a tad in preparation for the rigging wires.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:01
Views : 538
Organization finds lost treasures and tools.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:00
Views : 560
This cosmic occurrence usually twice per year.
Page (32 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]