Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (27 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:55
Views : 1163
Working on removable nose plate for better access and thrust line adjustment.
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:54
Views : 1111
Guillow's designs have used alignment formers in box fuselages since the 1930s. I think it's a great idea and use them in my own box fuselage designs.
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:53
Views : 1079
Don't realize how many pins you use until you line them up. These pins held down one side of fuselage.
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:52
Views : 1033
Moved motor peg forward one bay because the motor peg area is rather constricted if built per plan. Others have made fuselage wider in rear.
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:50
Views : 1043
Starting on fuselage.
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:49
Views : 1047
The way I actually did it.
Hangar Aircraft Category Date Preview
hjlittmanGuillows Series 700 - ArrowBuild25-Mar-14 11:48
Views : 1041
Strange instructions for dihedral
hjlittmanGuillows Series 700 - ArrowBuild17-Mar-14 16:05
Views : 1053
At the end of the first hour I had the tail feathers and most of the wing rough framed.
hjlittmanGuillows Series 700 - ArrowBuild17-Mar-14 16:03
Views : 604
Starting with the tail feathers. I don't like to put pins through the parts, if I can avoid it, so I use some rather long push pins I found at Office Depot, They are not as long as the Czech pins made just for model building, but they work rather well.
hjlittmanGuillows Series 700 - ArrowBuild17-Mar-14 16:01
Views : 620
I'm keeping a time on the work bench because I only have an hour a day to work on it.
hjlittmanGuillows Series 700 - ArrowBuild17-Mar-14 15:54
Views : 615
Started by examining the plans to see what mods I would make. The landing gear wire pattern was on the side of the plan that would be down while assembling the structure so I bent the landing gear wire before pinning the plans to the board.
hjlittmanGuillows Series 700 - ArrowBuild17-Mar-14 15:52
Views : 629
Started on Arrow kit for "G" Challenge. Catalog in box and date code on decal sheet confirms that the kit was produced in December of 2009.
Page (27 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]