I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (16 in total) :  <<   7   8   9   10   11  [ 12 ]  13   14   15   16  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Jun-07 18:42
Views : 1304
Lots of trial fitting onto stabilizer before shaping but fit is perfect. Going to use the pre-built moveable rear rudder assemly and the cardboard overlays so panel lines can be used as per plan. Only thing, should have doped the stabilizer prior to multi
moostang51Guillows Series 2000 - B-24 LiberatorBuild15-Jun-07 18:35
Views : 1294
New carved rudder. Starts as a 1/2 stock. First cut through notch for stabilizer then lots of shaping and sanding. Used the Guillows plan for final profile.
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild10-Jun-07 18:10
Views : 1361
Whatever is on the plane has been prepped for covering. Had a little issue with the shaping of the right rudder. The rudder construction on this plane proved to be quite a challenge since it will be moveable. Cosidered carving it out of 3/8 solid stock bu
moostang51Guillows Series 2000 - B-24 LiberatorBuild10-Jun-07 18:01
Views : 1368
Wings completed. Extra stringers and the use of heavy grade silkspan makes for a much better finished product.
Page (16 in total) :  <<   7   8   9   10   11  [ 12 ]  13   14   15   16  [ < Prev ] [ Next > ]