I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (16 in total) :  <<   9   10   11   12   13   14   15   16  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild26-Mar-07 17:56
Views : 1526
Left side stringers doubled. Rubber band at the nose assists in holding curve. Am using a new CA glue (Build It from Tower Hobbies) Using the thin and medium but the thin is like water. Tough to control amount of flow so I hope I don't experience problems
moostang51Guillows Series 2000 - B-24 LiberatorBuild26-Mar-07 12:26
Views : 1518
Half an hour later, notches on the left side are completed. The 1/16" sheet gives a perfect slot for the 3/32" stringers. Now for the right side.
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorBuild26-Mar-07 12:22
Views : 1431
A dremel with carbide cutter and 1/16" thick sheet with 220 sandpaper glued on does the trick for notching extra stringers. The dremel was set at slowest speed for maximum control.
moostang51Guillows Series 2000 - B-24 LiberatorBuild25-Mar-07 18:23
Views : 1384
HUGE.... Considering keeping the wings detachable. Both tops of F-16 formers are 5 1/16 inches above a level surface and B1 former connection perpendicular too. Whew!!!!!
Page (16 in total) :  <<   9   10   11   12   13   14   15   16  [ < Prev ] [ Next > ]