I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (9 in total) :  1   2  [ 3 ]  4   5   6   7   8   9  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustDumas Kit #1812, DH-4Build27-Jan-09 20:33
Views : 688
As you can see the shop is clean. After the prop tomorrow this bird will be complete. Next the Pfalz Dr-1!
John M OshustDumas Kit #1812, DH-4Build27-Jan-09 18:15
Views : 639
A laminated hardwood prop is hiding in the pieces of oak and walnut.
John M OshustDumas Kit #1812, DH-4Build27-Jan-09 18:13
Views : 640
Henry's profile.
John M OshustDumas Kit #1812, DH-4Build27-Jan-09 18:12
Views : 672
Henry G Boonstra, barnstormer and air mail pilot.
John M OshustDumas Kit #1812, DH-4Build27-Jan-09 16:30
Views : 658
Landing lights. The lower light was angled outward for side illumination. The upper straight. Now to make the parts for a prop.
John M OshustDumas Kit #1812, DH-4Build27-Jan-09 12:25
Views : 716
Aileron cranks and cables installed. Landing lights next.
Hangar Aircraft Category Date Preview
John M OshustDumas Kit #1812, DH-4Build26-Jan-09 19:44
Views : 656
Rigging completed. Tomoroow the wire for the ailerons.
John M OshustDumas Kit #1812, DH-4Build26-Jan-09 17:36
Views : 651
Left rigging complete....I hope I have enough gas to finish the right today.
John M OshustDumas Kit #1812, DH-4Build26-Jan-09 17:34
Views : 599
John M OshustDumas Kit #1812, DH-4Build26-Jan-09 17:33
Views : 599
Port rigging completed.
John M OshustDumas Kit #1812, DH-4Build26-Jan-09 09:16
Views : 595
Cabane rigging complete...on to the wings.
John M OshustDumas Kit #1812, DH-4Build25-Jan-09 19:08
Views : 578
Cabane struts painted....tpmorrow the rigging.
Page (9 in total) :  1   2  [ 3 ]  4   5   6   7   8   9  [ < Prev ] [ Next > ]