I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (12 in total) :  <<   3   4   5   6   7  [ 8 ]  9   10   11   12  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
poppyEureka Boeing B-29Build29-Jun-09 19:40
Views : 967
poppyEureka Boeing B-29Build29-Jun-09 19:39
Views : 753
Have to return to lake this week so I thought I would post the full span pics.
poppyEureka Boeing B-29Build25-Jun-09 18:47
Views : 654
Full span-right wing.
poppyEureka Boeing B-29Build23-Jun-09 18:12
Views : 740
Another 37" will be added to complete full wingspan.
poppyEureka Boeing B-29Build23-Jun-09 18:11
Views : 711
Test fit of wing sections.
poppyEureka Boeing B-29Build21-Jun-09 18:20
Views : 685
3/16" spars added mainly to keep balsa skins from sagging. Inner wings are 20 1/2" inside to outside ribs. Outer wing panel will be 18 1/2" and is removable.
Hangar Aircraft Category Date Preview
poppyEureka Boeing B-29Build21-Jun-09 18:17
Views : 679
Nacelles frames finished and attached to wing.
poppyEureka Boeing B-29Build21-Jun-09 18:16
Views : 657
Port inner wing frame done. Test fit of engine nacelles.
poppyEureka Boeing B-29Build18-Jun-09 15:40
Views : 827
For scale. The handsome guy is 5'9"".
poppyEureka Boeing B-29Build16-Jun-09 11:26
Views : 716
1/4" basswood splice joiner. 1/4"X1/4" basswood braces added. They aren't pretty but they do the job.
poppyEureka Boeing B-29Build16-Jun-09 11:24
Views : 698
Both halves joined and glued in place.
poppyEureka Boeing B-29Build16-Jun-09 11:24
Views : 695
Rear fuselage fully skinned. Open area is for stab. installation. Stabs span 27".
Page (12 in total) :  <<   3   4   5   6   7  [ 8 ]  9   10   11   12  [ < Prev ] [ Next > ]