I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (26 in total) :  <<   8   9   10   11   12  [ 13 ]  14   15   16   17   18   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 800 - MosquitoBuild17-Feb-08 14:50
Views : 851
After all trial fitting and shaping, the 1/16" balsa sheet is glued into position to reinforce thin nacelle sides during glue up. Will also back-up any filler required. Thank you DD.
moostang51Guillows Series 800 - MosquitoBuild17-Feb-08 14:47
Views : 814
Nacelle on left after glue up, filler and one coat primer at seam. Right nacelle glue up only. Any trace of seam will provide stencil for panel line.
moostang51Guillows Series 800 - MosquitoBuild16-Feb-08 17:19
Views : 811
Don't mind the skewed left LG, nothing glued permanent. Learned that long ago. Screening to be used for grillwork at wing root/ fuse connnection.
moostang51Guillows Series 800 - MosquitoBuild16-Feb-08 15:20
Views : 765
Low tack scotch tape holds nacelles parts together for trial fit. Light Coor's holds Moostang together to get this far. Quite the gonad breaker.
moostang51Guillows Series 800 - MosquitoBuild10-Feb-08 14:53
Views : 788
Cockpit on hold till wings permanently attached. LG aluminum paint drying. Lots of plastic parts to cut out.
moostang51Guillows Series 800 - MosquitoBuild10-Feb-08 14:50
Views : 753
Hangar Aircraft Category Date Preview
moostang51Guillows Series 800 - MosquitoBuild10-Feb-08 13:16
Views : 785
A different look for the Mossie. Black belly and red numerals told me this is the one. After the Lib, stay away from stripes.
moostang51Guillows Series 800 - MosquitoBuild09-Feb-08 15:55
Views : 827
DD, you were right, a real PIA to make wire work as Guillow's suggest. Two hours of planning and a little improv provided great results. Second one will be a breeze.
moostang51Guillows Series 800 - MosquitoBuild03-Feb-08 15:51
Views : 814
Mild weather in NJ today let me get some covering done.
moostang51Guillows Series 800 - MosquitoBuild02-Feb-08 17:28
Views : 852
While the pilot seat dries to shape, some gauges, controls and initial wiring harnesses are installed. My fat, twisted carpenter fingers require the use of tweezers and needle nose pliers.
moostang51Guillows Series 400 - P-51 MustangBuild02-Feb-08 17:23
Views : 1768
The Mossie needs a cockpit. Mini chain saw to achieve navigator/ bombadier openings. Planking of decks and fuse complete.
moostang51Guillows Series 800 - MosquitoBuild27-Jan-08 15:42
Views : 912
Shaping/sanding complete. Ready for sealer (will use white glue) then cover probably next weekend with heavy silkspan and dope. Search is ongoing for a good cockpit photo.
Page (26 in total) :  <<   8   9   10   11   12  [ 13 ]  14   15   16   17   18   >>  [ < Prev ] [ Next > ]